The door, complete with a lock and a set of hardware, for the modernization of boilers and heat generators of third-party manufacturers for manual fuel loading. Luke is purchased separately. Designed to replace or re-equip boilers with manual fuel loading.
Execution - two layers of thermal insulation with a specialized refractory mat, with high insulating properties, the load-bearing frame of the geometry is placed outside the zone of thermal stress. Replaceable heat shield. The door is completed with a set of adjustable hinges to adjust the tight pressure of the door to the hatch, both during installation and during operation. Complete with ceramic fiber seal. Black color.
The door is adjacent to the trough, which is purchased separately, or works in tandem with the boiler trough in case of matching sizes.
Contents of delivery
- solid door
- loop set.
- hardware kit.
- door lock complete
Articles
DC-50
Reviews
There are no reviews yet.